Exclusive Content:

The future of Quartier Cavendish: information meeting hints at highrises and a hotel

How does the Hilton Quartier Cavendish sound? Could a hotel...

It is time for our citizens to engage on our Master Plan and shopping center proposals

In June, the  City of Côte Saint-Luc began the...

Facilitating another meeting between condo reps from Marc Chagall with the administration of the Equinoxe

Soon after developers announced they planned to construct two high rise rental buildings on Marc Chagall Avenue I established an ad hoc committee, consisting of  representatives from the four  condominum complexes on the street (Le Cours Marc Chagall, La  Marquise, The Bellagio, Rothchild II and on Mackle Road the Rothchild I).  We began meeting immediately and a lot of issues were resolved as the new Equinoxe became a reality,

I always begin my stories  on the Equinoxe with the historical note that the zoning to allow for this facility was adopted by a previous city council more than 30 years ago.

On April 29,  I convened another meeting. This time we gathered at the Equinoxe, which everyone on hand agreed closely resembles a five star hotel.

IMG_5070

A picture of our group with André Doudak (left) at the Equinoxe.

Present was  André Doudak,  the president of lead developer Jadco and Philippe Mourani who oversees the new building.  Representing the condos were: Lyon Kunin and Albert Aaron (Rothchild II); Eddie Bornstein (Rothchild I);  Sheldon Lang (resident, Equinoxe);  Sid Margles and Mike Cuplowsky (Marquise); Syd Rosen and Allan Familiant (Bellagio); and  Jason Ullman (Les Cours Marc Chagall).à

Update

André Doudak reported that all but two of Phase One’s 170 units are occupied. Excavation is nearly complete and a crane will be installed next week to begin the construction phase for the second tower, which will number 116 units. It is scheduled for completion for spring 2020, with move in date likely in July 2020. The bulk of the “messy” excavation was done during the winter when most people were away. There is no weekend construction for this phase. Only certain weeknights will they work late for the pouring of cement.

Everyone agreed that thus far efforts by the construction crew to keep the street clean have been successful. It is hoped this will continue. Ditto for the presence of a crew member to direct traffic when needed- a valuable safety measure,

Condo reps were  then given the floor to air any concerns.

Rothchild II

Cement trucks will be present soon for a six month period. Mr. Kunin and Mr. Aaron alluded to Phase One when these trucks parked on Lismer and they were cleaned, leaving behind  a very large mess. They asked that this not be repeated. Mr, Doudak took note.

Rothchild I

The presence of the generator at the side of the building resulted in a winter of misery for  many Rothchild I residents. The Equinoxe did not have a full Hydo-Québec hookup until April 14, so the generator was regrettably necessary to power their building. Efforts  were made to baffle the sound,  but this was not completely successful. Eddie Bornstein asked if the generator could be moved inside the building. Mr. Doudak said this is not possible, but he made it clear that that the generator will not cause the neighbours any more problem. It will be tested once a week for a few minutes, likely mid-morning during a weekday. The only time it will ever be used again is in the event of a power failure. Should such an event occur, the Rothchild I will be in the same boat.

Marquise

Mike Cuplowsky suggested that a temporary fence be erected near the excavation area as a safety precaution. He also asked that attention be given to a generator placed in the back of the building and whether it is necessary.

Les Cours Marc Chagall

Jason Ullmann asked about the makeshift parking lot next door. Mr. Doudak said his workers will be using it this summer. Councillor Cohen noted that it will be returned to greenspace after the construction concludes in the summer of 2020. It is his hope and mine for this to become some kind of parkland.

The Bellagio

Syd Rosen expressed his appreciation for the cleaning efforts thus far. He was also pleased  to hear workers will park in the lot and not take up spaces on the street. Dust does tend to come from the construction  and effect the air conditioning units of some residents.

The Montefiore

Mr. Doudak shared with the group this company purchased the former Manoire Montefiore seniors home at  Mackle and Cavendish last year. They are gutting the inside and building about 100 new rental apartment units. They will also be repurposing the main floor for additional garage spots. More news to come on a name and potential opening date.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Related

Gardens of Distinction program replaces Maisons Fleuries/Le programme Jardins d’exception

The Maisons Fleuries program has been a mainstay in...

The future of Quartier Cavendish: information meeting hints at highrises and a hotel

How does the Hilton Quartier Cavendish sound? Could a hotel...

Public Safety Station will not be placed at the corner of The Avenue and Park Place

The long awaited first Public Consultation meeting for the...

Why I voted against the Master Plan/ Pourquoi j’ai voté contre le plan d’urbanisme

For the first time in 20 years, the City...

Newsletter

spot_img

Don't miss

Accidents cause serious damage to traffic lights at two important intersections

For the second time in two months, traffic lights...

The 44th Côte Saint-Luc Golf Classic was a wonderful day on the links

On August 5, I once again co-chaired and took...

The Musicians of the World Symphony Orchestra to perform at CSL Concert Aug. 10

The Musicians of the World Symphony Orchestra (MWSO) was...

Community stalwart Edna Janco made an impact as my constituent/En mémoire d’Edna Janco

I was wondering in recent weeks  why one of...
Mike Cohen
Mike Cohenhttps://mikecohen.ca
Mike Cohen, born and raised in Côte Saint-Luc, has long been active in the community as a volunteer, journalist, and consultant. He attended local schools and was first elected as City Councillor for District 2 in 2005. Since then, he has been re-elected in each municipal election, most recently in 2021.
spot_imgspot_img

Accidents cause serious damage to traffic lights at two important intersections

For the second time in two months, traffic lights are out at an important Côte Saint-Luc intersection due to a car accident. Early Sunday morning,...

The 44th Côte Saint-Luc Golf Classic was a wonderful day on the links

On August 5, I once again co-chaired and took part in the annual Côte Saint-Luc Golf Classic at Meadowbrook. It was our 44th annual...

Town Hall Aug. 25: Expert panel to focus on Cavendish Blvd Extension/ un panel d’experts

When I was first elected 20 years ago I made a commitment to do things differently as a Côte Saint-Luc city councillor. My first...

LEAVE A REPLY

Please enter your comment!
Please enter your name here