Last week I met with two senior members of our Public Works Department, Jordan Guetta and Thierry Dhaisne, to do a walkabout at Rembrandt Park and conduct a review.

  • The rim and backboard for the kids basketball court will be replaced soon.
  • Equipment for toddlers will be checked for safety.
  • The park equipment will be evaluated at the end of month
  • The pathway that fills with water each year will be filled with grass.
  • In the last few years the roof has been replaced on the chalet, a new handicapped accessible bathrooms and new water fountains have been installed.
  • I have asked that the unused petanque court be moved and replaced with more greenspace.
  • One of the picnic tables on the soccer field will be moved to a more appropriate place.

Each park gets specific allocations. Over the last decade, Rembrandt has benefitted from a generous array of allocations. The lighting for the tennis courts has been changed, a permanent ping pong table installed and the basketball courts were completely redone. The kids court was a new addition. Several pathways were fixed as well.

2025path

Removing the leaky path.

In the Capital Expenditures Plan over the next three years, Public Works plans to replace the stairs of the external amphitheatre , add a glide wheelchair swing to the park and replace the light fixtures. In the interim, lights will be checked.

2025petanque

The petanque courts need to be removed.

 

La semaine dernière, j'ai rencontré deux membres chevronnés de notre service des travaux publics, Jordan Guetta et Thierry Dhaisne, afin de faire une visite du parc Rembrandt et de procéder à une évaluation.

  • Le rebord et le panneau du terrain de basket pour enfants seront bientôt remplacés.
  • La sécurité des équipements pour les tout-petits sera vérifiée.
  • Les équipements du parc seront évalués à la fin du mois.
  • Le chemin qui se remplit d'eau chaque année sera recouvert de gazon.
  • Au cours des dernières années, le toit du chalet a été remplacé, de nouvelles toilettes accessibles aux personnes handicapées et de nouvelles fontaines ont été installées.
  • J'ai demandé que le terrain de pétanque inutilisé soit déplacé et remplacé par un espace vert.
  • L'une des tables de pique-nique du terrain de football sera déplacée vers un endroit plus approprié.

Chaque parc bénéficie d'allocations spécifiques. Au cours de la dernière décennie, Rembrandt a bénéficié d'une généreuse série d'allocations. L'éclairage des courts de tennis a été modifié, une table de ping-pong permanente a été installée et les terrains de basket ont été entièrement refaits. Le terrain pour enfants est une nouvelle addition. Plusieurs allées ont également été réparées.

Dans le plan des dépenses en capital pour les trois prochaines années, les travaux publics prévoient de remplacer les escaliers de l'amphithéâtre extérieur, d'ajouter une balançoire pour fauteuils roulants au parc et de remplacer les luminaires. Dans l'intervalle, l'éclairage sera vérifié.

Related

Game and Grub Mike Cohen

Editor’s Note: As a foodie and sports  aficionado, I...

Ilan Ramon plaque returned to its proper place in Côte Saint-Luc

Ilan Ramon was the first Israeli astronaut on the...

Three generous donations give a boost to the Côte Saint-Luc Cats Committee

I would like to provide an update on the...

The Côte Saint-Luc Cats Committee has an uncertain future

Some 15 years ago a lover of cats named...

Newsletter

Don't miss

A change in format for my annual District Town Hall

Ever since I was first elected as the city...

The 2026 Côte Saint‑Luc Golf Classic set for July 7 at Meadowbrook Golf Course

The City of Côte Saint‑Luc will host the 2026...

Temporary stop sign on Kildare and Rembrandt a relief during  Hydro work

With Hydro-Québec's major infrastructure work on Merrimac Street and...

The Côte Saint-Luc Master Plan has been adopted and I support it

On Monday, May 11  four and a half years...
Mike Cohen
Mike Cohenhttps://mikecohen.ca
Mike Cohen, born and raised in Côte Saint-Luc, has long been active in the community as a volunteer, journalist, and consultant. He attended local schools and was first elected as City Councillor for District 2 in 2005. Since then, he has been re-elected in each municipal election, most recently in 2025. Mike Cohen, né et élevé à Côte Saint-Luc, est depuis longtemps actif au sein de la communauté en tant que bénévole, journaliste et consultant. Il a fréquenté les écoles locales et a été élu pour la première fois conseiller municipal du district 2 en 2005. Depuis lors, il a été réélu à chaque élection municipale, la dernière fois en 2025.

A change in format for my annual District Town Hall

Ever since I was first elected as the city councillor for District 2 more than 20 years ago, I have held regular Town Hall...

The 2026 Côte Saint‑Luc Golf Classic set for July 7 at Meadowbrook Golf Course

The City of Côte Saint‑Luc will host the 2026 Golf Classic on Tuesday, July 7, 2026, at Meadowbrook Golf Course, 7001 Côte Saint‑Luc Road....

Temporary stop sign on Kildare and Rembrandt a relief during  Hydro work

With Hydro-Québec's major infrastructure work on Merrimac Street and part of Kildare Road expected to continue through the end of August, I wanted to...