Exclusive Content:

The future of Quartier Cavendish: information meeting hints at highrises and a hotel

How does the Hilton Quartier Cavendish sound? Could a hotel...

It is time for our citizens to engage on our Master Plan and shopping center proposals

In June, the  City of Côte Saint-Luc began the...

Work on the CP Railway tracks to be done overnight

Canadian Pacific Railway (CP) will be doing work on the railway tracks behind Baily, Wavell and Holland roads in the evenings and overnight periods of approximately Wednesday, July 29 to Monday, August 3. This will regrettably impact and inconvenience anyone living in that vicinity.

Please note that the City of Côte Saint-Luc does not have jurisdiction over work performed on the railway tracks.

CP is replacing the ties, which are the pieces of wood that connect the two rails. This work is part of their ongoing investment in their tracks. CP is starting work on Tuesday, July 28 in Lasalle and moving east through Montreal West, Côte Saint-Luc, Hampstead, TMR and Outremont.

Because the AMT commuter trains use the track during the day, CP says it must do the work between 7:30pm and 2:30am. CP acknowledges this work will be noisy and may be disruptive to residents. You may hear motor sounds of heavy machinery in operation and idling, metal percussion, compacting sounds from tamper equipment, voices of 25 to 35 people, and the beep sounds from trucks that are backing up.

If you have questions or concerns about the work, contact Canadian Pacific at 1-800-766-7912 orcommunity_connect@cpr.ca.

  Travaux de nuit effectués par le Canadien Pacifique 

Le Chemin de fer Canadien Pacifique (CP) effectuera des travaux sur les rails situés derrière les rues Baily, Wavell et Holland, en soirée et durant la nuit, du mercredi 29 juillet au lundi 3 aout approximativement.

Il importe de souligner que la Ville de Côte Saint-Luc n’a pas compétence en matières des chemins de fer.

Le CP procède au remplacement des traverses, qui sont les pièces de bois reliant les deux rails. Ces travaux font partie de l’investissement actuel de la compagnie dans son réseau de voies ferrées. Le CP commence les travaux le mardi 28 juillet à LaSalle et se déplacera ensuite à Montréal-Ouest, Côte Saint-Luc, Hampstead, Mont-Royal et Outremont.

Puisque les trains de banlieue de l’AMT utilisent la voie durant la journée, CP a indiqué qu’ils doivent effectuer les travaux entre 19 h 30 et 2 h 30. La compagnie reconnaît que ces travaux peuvent être bruyants et dérangeants pour les résidants. Il se peut que vous entendiez le bruit de moteurs provenant de machinerie lourde en activité ou tournant au ralenti, de matériel de percussion de métal, d’outils de compactage, le bruit de conversation de 25 à 35 travailleurs, et les avertisseurs sonores des camions qui reculent.

Si vous avez des questions ou des inquiétudes concernant ces travaux, veuillez contacter le Canadien Pacifique au1-800-766-7912 ou community_connect@cpr.ca.

Related

Meeting held with senior CP Railway officials to deal with train noise

In a show of force, Mayor Mitchell Brownstein, Mount...

Is train noise bothering you? We need to hear your voice loud and clear

At my most recent District 2 Advisory Committee meeting,...

Canadian Pacific Railway officials look for solutions on train noise problems

When I first moved into my present home after...

Newsletter

spot_img

Don't miss

Accidents cause serious damage to traffic lights at two important intersections

For the second time in two months, traffic lights...

The 44th Côte Saint-Luc Golf Classic was a wonderful day on the links

On August 5, I once again co-chaired and took...

The Musicians of the World Symphony Orchestra to perform at CSL Concert Aug. 10

The Musicians of the World Symphony Orchestra (MWSO) was...
Mike Cohen
Mike Cohenhttps://mikecohen.ca
Mike Cohen, born and raised in Côte Saint-Luc, has long been active in the community as a volunteer, journalist, and consultant. He attended local schools and was first elected as City Councillor for District 2 in 2005. Since then, he has been re-elected in each municipal election, most recently in 2021.
spot_imgspot_img

Gibbys introduces a terrasse and lunch service, Chez Delmo’s history & Frost˚d enters the donut game

It has been just over two years now since the Grandio Group purchased the iconic Gibbys Restaurant in Old Montreal as well as the...

Accidents cause serious damage to traffic lights at two important intersections

For the second time in two months, traffic lights are out at an important Côte Saint-Luc intersection due to a car accident. Early Sunday morning,...

The 44th Côte Saint-Luc Golf Classic was a wonderful day on the links

On August 5, I once again co-chaired and took part in the annual Côte Saint-Luc Golf Classic at Meadowbrook. It was our 44th annual...

2 COMMENTS

  1. Hey Mike,
    As a city councillor, YOU are the one who should be speaking with CP if there arts any complaints.
    The railway as you said and I quote :
    “Please note that the City of Côte Saint-Luc does not have jurisdiction over work performed on the railway tracks.”
    Rather than “pass the buck”, you can make yourself look good by printing your responses from “disrupted citizens” from the CP noise, and CP may actually do something from a “higher up”.
    I should know. CP did absolutely nothing after I voiced my concern to Cp about various issues, and the same when I voiced my complaints to my city Councillor Dita Bourku.

  2. My previous comment was meant to say that nothing was done even after I wrote Dita Berku, who then said that she wrote or spoke to CP about my complaints.

LEAVE A REPLY

Please enter your comment!
Please enter your name here