The city has undertaken some work on Kildare Road near Rembrandt. This included two solid days of paving. A number of small ditches were filled with over 10 tons of asphalt. It was done with a tar adhesive and a cold patch. This objective was to fill pot holes and street irregularities and it should minimize vibrations following the water main breaks exprienced last winter. It is an interim measure since a large strip of Kildare Road will be fitted with brand new piping. Work is also finished on the repaving of the street and sidewalks on Sir Walter Scott. Line painting will take place this week.